We put in an offer and it was accepted. The closing took place in March. Then we had to wait all summer until work can begin in the fall. Now the slabs for the house and garage are in with the in ground plumbing, the septic system and temporary electric run to the site. The pole house and garage can't begin until February at the soonest and the well still has to be dug.
The house will face west over the pond with a deck and upper balcony on the second floor were my studio will be. Another nice feature is the Shooting Star Bike trail on the other side of State Highway 56.
I have already did some artwork inspired by this site.